The NinetyThird by Qatar Airways - The O2

Project: The NinetyThird by Qatar Airways - The O2.

Location:- The 02
Client: GF Holding
Project: Complete interior fitout of traditional signage, bespoke mirror gold totems, digital totems, print graffiti graphics, illuminated lettering and decorative imagery.


High end bespoke projects with new innovative and challenging materials is what excites us at Image and this project had it all. A combination of traditional signage, mirror gold totems, light boxes, digital totems, illuminated lettering and printed graphics.
 

Project Brief:
Manufacture and deliver an exciting signage scheme for a premium members club at The O2.


The Challenge:
To join the delivery team with a wealth of bespoke manufacturing experience enabling us to overcome the challenges that came our way whilst integrating our products seamlessly within the premium fit out going on alongside our works.

We found ourselves integral to the design and build of all signage and branding on site, taking the architects ideas, and making them reality. The design brief was challenging but exciting, giving us chance to test our creative skills. The main challenges we faced where designing and building the bespoke totems from high end mirror polished material at the scale required. Factoring in weights and transportation through to getting product into the venue itself. With limited headroom over the structures, the teams often working in small spaces manoeuvring large sections of stainless steel around whilst working around other contractors on site daily.
 

How We Helped:
Our priority was to deliver the bespoke signage scheme according to the designer’s brief, customer’s timeline and within budget.


Outcomes:
We successfully collaborated with the delivery team to deliver the superclub. Communication was smooth and efficient with all other parties on the project, enabling us to deliver the signage on time and within budget, with no unforeseen problems or delays during installation.  

 

The O2 - The NinetyThird - 22nd January 2024 by Luke Dyson - LD3_0178-Enhanced-NR
The O2 - The NinetyThird - 22nd January 2024 by Luke Dyson - LD3_0085-Enhanced-NR
The O2 - The Residence - Chemical Brothers - 4th November 2023 by Luke Dyson - LD3_1376
The O2 - The NinetyThird - 22nd January 2024 by Luke Dyson - LD3_0156-Enhanced-NR
The O2 - The Residence - Chemical Brothers - 4th November 2023 by Luke Dyson - LD3_1314
The O2 - The Residence - Chemical Brothers - 4th November 2023 by Luke Dyson - LD3_1303